Gwynne Anthony 2020

ART506 Dissertation 2019. Anthony Gwynne . 121 Questionnaire A. General Information 1. Your Name: 2. Your Position: [ ] Building control surveyor [ ] Building contractor [ ] Building owner [ ] Conservation officer [ ] Designer (including Architect/surveyor/structural engineer) [ ] Other (please state) 3. Your contact details (optional): B. Project carried out 3. Please completed the following for a project carried out on a traditional, historic or listed building you have you been involved with in the last 2 years. (Note: This only includes work carried out to an existing building with solid wall construction built before 1919 and excludes new extensions). Project Item Question Answer (please use continuation sheet below if required) 1 Description of the work 2 Status of the work [ ]Commenced [ ] In progress [ ] Completed Date commenced Date if still in progress Date completed 3 Why was the work undertaken and why? (please state reasons) 4 Are you conservation accredited or have you carried out any form of conservation training? [ ]No [ ] Yes (If yes please state below what form of conservation accreditation/ appropriate training was undertaken and when) 5 Was a survey/condition survey /investigation of the building carried out to establish type of construction? [ ] No [ ] Yes 6 State existing form of construction and materials used (or attached plan details/specification/other) 7 Are you aware of what vapour permeable construction/materials are? [ ] No [ ] Yes 8 Are you aware that non- vapour permeable construction can harm traditional and historic buildings in certain situations? [ ] No [ ] Yes 9 Was planning permission/listed building consent/Building Regulations approval required/applied for this project? [ ] No [ ] Yes (if yes please state below the planning/listed /Building Regulations reference numbers) 10 If planning permission/listed building consent/Building Regulations approvals were issued did it have conditions regarding the use of vapour permeable materials? [ ] No [ ] Yes (if yes please state below the conditions on the planning/ Building Regulations or attach a copy) 11 Was a faculty required? (Applies to churches etc) [ ] No [ ] Yes (if yes please attach a copy of the Faculty including conditions) 12 How was the design solution determined

RkJQdWJsaXNoZXIy MjgyMjA=